Lightning Protection
Design, installation and care of lightning protection systems that keep buildings and the people in them safe.
- Lightning protection design
- New system installation
- System alterations and extensions
- Inspection and testing
Fabier Building Performance
Specialist building protection, inspection and maintenance delivered with clarity, care and technical discipline.
People. Places. Performance.
Fabier exists to make buildings safer, better maintained and easier to manage. We combine specialist technical delivery with a clear, accountable service built around the people responsible for property.
What we do
Design, installation and care of lightning protection systems that keep buildings and the people in them safe.
Annual testing, certificates, remedials and test and maintenance agreements.
Earthing systems designed, installed and verified with the same discipline as our protection work.
Surveys, BS EN 62305-2 risk assessments, design and technical submissions.
Why Fabier
Specialist knowledge delivered in plain language, so you always know where your building stands.
Practical recommendations and records you can rely on — for insurers, auditors and your own peace of mind.
The same care across site work, reporting and client service, on every building, every time.
We work for lasting building performance, not one-off transactions.
Projects
Student accommodation · 2025 to 2026
Design, supply, installation, testing and certification of six separate Class IV lightning protection systems to two accommodation blocks and four terraces, plus a UKPN substation earth.
Structures protected
Contract value
Protection class
Read case study
Residential · 2026
Level IV protection to two new buildings using the structural frame as down conductors and the pile foundations as the earth electrode, with a 20 x 20 m aluminium mesh and bonded roof handrails.
Down conductor positions
Dedicated earth rods
Site attendances
Read case study
Sports · 2023
Lightning protection to a new steel framed training ground building using 13 structural columns as down conductors and 13 pile caps as the earth termination, with an aluminium tape air termination at roof level.
Columns as down conductors
Pile cap earth connections
External down tapes
Read case study